Challenge
Following a Scottish Water audit, Ladybank Commercial Crescent WWPS 2 was found to have a number of issues preventing the asset from being adopted.
These ranged from operational and maintenance concerns through to construction and compliance-related defects, including:
- Inaccessible penstock controls.
- Non-compliant valve chamber support arrangements.
- Duct sealing deficiencies.
- Level control sensor positioning concerns.
- Verification of pump performance and pass-forward pumping rates.
- Valve chamber access and maintenance compliance issues.
With adoption dependent on these issues being resolved, Fife Council required an experienced wastewater specialist with a knowledge of Scottish Water's requirements, and who was capable of delivering both technical compliance assessments and remedial works.